Filter
Requirements
BCA
This circular informs the industry on the publication of the Guidebook for Virtual TOP/CSC (360 Capture). This guidebook is developed by BCA to provide guidance on the usage of 360 Capture as an alternate means for TOP/CSC inspection purposes.This circular also informs the industry on the publication of the Guidebook for Site Management Platforms (Part A For Solution Providers). This guidebook is developed by BCA to provide guidance to solution providers to develop Site Management Platforms (SMPs) for regulatory use cases; which includes basic functional requirements and recommended workflows for digital management of essential sites and test records.
Published Date:
03 March 2025
Effective Date:
04 March 2025
Advisories
SCDF
AMENDMENTS TO FIRE CODE 2023 3RD BATCH OF AMENDMENTS
SCDF would like to issue the 3rd batch of amendments to the Code of Practice for Fire Precautions in Buildings 2023 (Fire Code 2023). The amendments, which were deliberated and accepted by the Fire Code Review Committee are attached as Annex A of this circular. 2. Amendments stipulated in Annex A shall take effect from the date specified therein. Qualified Persons who wish to comply with the requirements in this Circular for any proposed plans of fire safety works for new buildings or existing buildings to be submitted during the 6month grace period (i.e., 3 Mar 2025 to 3 Sep 2025) can do so and are not required to apply for waivers. Such plans that are submitted to SCDF for approval on or after the effective date shall be subject to the amendments made to the Fire Code.
Keywords: 3rd Batch, Amendments, Fire Code 2023
Published Date:
03 March 2025
Effective Date:
03 March 2025
Technical Guides
BCA
LAUNCH OF RIE2025 COT GRANT CALL 6
Launch of Cities of Tomorrow RIE2025 Grant Call 6
Keywords: Cities of Tomorrow, Cot, Rie2025
Published Date:
26 February 2025
Effective Date:
27 February 2025
Pre-Consultation / Call for Comments
BCA
MOM-BCA ADVISORY ON HIRING OF PHANTOM WORKERS
MOM-BCA Joint Advisory on Hiring of Phantom Workers
Published Date:
14 February 2025
Effective Date:
14 February 2025
Administration / Service Improvements
URA
CLARIFICATION ON CONVERSION OF SURPLUS CAR PARKING SPACES (URA)
Clarification on Conversion of Surplus Car Parking Spaces
Published Date:
07 February 2025
Effective Date:
07 February 2025
Announcements
URA
REVISIONS TO REJUVENATION INCENTIVE SCHEMES FOR STRATEGIC AREAS
Revisions to Rejuvenation Incentive Schemes for Strategic Areas
Published Date:
07 February 2025
Effective Date:
07 February 2025
Advisories
LTA
USE OF ENHANCED FLEXIBLE PAVEMENT OVER WATER PIPE AT TRAFFIC JUNCTIONS, BUS LANES AND BUS BAYS
Use of Enhanced Flexible Pavement Over Water Pipe at Traffic Junctions, Bus Lanes and Bus Bays
Published Date:
24 January 2025
Effective Date:
24 January 2025
Grant Calls / Call for Submissions
BCA
BCA-URA - JOINT CIRCULAR ON UPDATES TO CORENET X IMPLEMENTATION PLAN
In our circular dated 26 September 2023, industry was informed of the implementation plan for CORENET X. The intention remains unchanged, that all projects should transit to the new regulatory approval process in phases. Over the past year, agencies have been in close dialogue with industry partners and practitioners. The feedback from industry has been useful in refining our processes and re-calibrating our implementation strategies, to facilitate a smoother transition.The adjustments to the implementation plan are outlined in this circular, including key steps that industry should take to prepare for CORENET X implementation
Published Date:
23 January 2025
Effective Date:
23 January 2025
Promotional
BCA
SAFE DESIGN AND INSTALLATION OF OUTRIGGERS OR OVERHEAD SUPPORTS FOR SUSPENDED SCAFFOLDS
Circular on Safe Design and Installation of Outriggers or Overhead Supports for Suspended Scaffolds
Published Date:
10 January 2025
Effective Date:
10 January 2025
Standards
Enterprise SG
ENTERPRISE SINGAPORE CALLS FOR PUBLIC COMMENTS 3 JANUARY 2025
ENTERPRISE SINGAPORE CALLS FOR PUBLIC COMMENTS 3 January 2025
Keywords: It Equipment, Data Protection, Windows, Smart Grid, Food Safety, Soil, Aluminium Alloy, Cable
Published Date:
08 January 2025
Effective Date:
09 January 2025
Subscribers are also advised to check the respective agencies’ websites directly for non-regulatory circulars and announcements.