Independent Submissions

To clear agency-specific requirements with no cross-agency dependencies e.g. land subdivision to URA, planting scheme to NPARKS, structural submission of ancillary structures such as barriers/ claddings to BCA, pollution control equipment to NEA, water service installation to PUB, instrumentation monitoring report to LTA, performance-based fire safety plans to SCDF. Clearances for each of the submissions would be issued separately.
Filter:

DisciplinesAgencyRequirement Category
URA

DisciplinesAgencyRequirement Category
BCA

Constructability Implementation Plan (CIP)

  • BIM Plans which describe and define the type, extent of use, and details of the system framework
  • Where any of the above cannot be modeled in BIM, 2D plans can be submitted

Supporting Documents for CIP:

  • Documents (e.g., photos, 2D plans, etc.) on the use of construction techniques, processes, plant, equipment, and innovative methods

Constructability Score (C-Score)

  • C-Score Calculations (to be computed and submitted by Builder in PDF format)

DisciplinesAgencyRequirement Category
URA

If developers intend to proceed with demolition works ahead of obtaining  DSP or DG Clearance, a demolition application for the demolition works will be required, accompanied by the payment of requisite fees to both URA and BCA.

URA will not require a separate demolition application if the works to be demolished are :

  • Shown within the proposal granted planning permission, or
  • A lodgment application has been made and URA's authorisation letter has been granted for a new erection or a reconstruction proposal that necessitates the demolition of any existing building structures.

DisciplinesAgencyRequirement Category
BCA

Major Energy Use Change during Operation

Periodic Energy Audit during Operation

DisciplinesAgencyRequirement Category
NParks

Planting Scheme (within Development Boundary)

  • To show location, number and species of existing and proposed trees / shrubs for planting areas

DisciplinesAgencyRequirement Category
LTA

Approval to commence engineering works within Railway Protection Zone / Railway Corridor

  • To submit plan for engineering works
  • To submit the Engineering evaluation report
  • To submit an Instrumentation Proposal and initial instrumentation readings
  • To submit a Method Statement of work
  • To submit a Hazard Analysis identifying all possible risks that may be posed to the rapid transit system and a description of the safety and precautionary measures to mitigate these risks
  • To submit the Contingency Plan and Emergency Procedure
  • To submit the Pre-condition Survey Report
  • To submit the Certified Survey Plans
  • To submit the Permit application form and other relevant forms
  • To submit the Construction schedule for the proposed development

Note: Refer to LTA’s Code of Practice for Railway Protection / Guidebook for Carrying Out Modification Work to Rapid Transit System (RTS) Stations or Railway by Private Developer / Guide to carrying out restricted activities within railway protection and safety zones for more requirements / detailed description


Approval to carry out restricted activities within Railway Safety Zone

Note: Refer to LTA’s Guide to carrying out restricted activities within railway protection and safety zones for detailed requirements / description


Approval to commence engineering works within Road Structure Safety Zone / Notification to carry out engineering activity on land adjoining public street
  • To submit plan for engineering works
  • To submit the Engineering evaluation report
  • To submit an Instrumentation Proposal and initial instrumentation readings
  • To submit a Method Statement of work
  • To submit a Hazard Analysis identifying all possible risks that may be posed to the rapid transit system and a description of the safety and precautionary measures to mitigate these risks
  • To submit the Contingency Plan and Emergency Procedure
  • To submit the Pre-condition Survey Report
  • To submit the Certified Survey Plans
  • To submit the Permit application form and other relevant forms
  • To submit the Construction schedule for the proposed development

Note: Refer to LTA’s Guide to Carrying Out Engineering Works within Road Structure Safety Zone and Engineering Activity on Land adjoining Public Streets for more requirements/ detailed description

DisciplinesAgencyRequirement Category
NEA

Noise Impact Assessment (NIA-Post) for Land Traffic Noise

NIA (Post) report will be required for:

  1. New residential and noise-sensitive developments located within 70m of existing land traffic noise sources/hotspots (e.g., expressways/major arterial roads/MRT tracks) on existing residential and
  2. Existing noise-sensitive developments located within 70m of new transport-related developments (e.g., expressways/major arterial roads/MRT tracks/bus interchanges/bus depots), inclusive of the expansion of existing transport-related infrastructures.

 

When to apply:

  • Applicant will need to submit NIA (Post) report to NEA directly via email to DCLD_consultation@nea.gov.sg before Completion Gateway (G3) and concluded before TOP can be granted.
  • Sufficient time shall be catered for NEA to process the NIA (Post).
  • The processing of NIA (Post) will take 1-2 months.

Who to submit:

  • QP appointed should submit the above information and keep other relevant QPs in the loop.
  • The same QP should follow through the submissions for all gateways.

Noise Report for ACMV

Noise report for ACMV will be required for non-industrial developments which have new air-conditioning and mechanical ventilation works, including relocations.

When to apply:

  • Applicant will need to submit ACMV noise report directly to NEA before Completion Gateway (G3) and concluded before TOP could be granted.

Who to submit:

  • QP appointed should submit the above information and keep other relevant QPs in the loop.
  • The same QP should follow through the submissions for all gateways.

Pollution Control Equipment (PCE)

PCE submission will be required for developments involving proposed PCE/fuel burning equipment (e.g., Boiler, Thermal Oxidiser, Scrubber, Dust Collector, Spray Paint Booth, etc.).

When to apply:

  • Applicant will need to submit technical details of the PCE and/or Fuel Burning Equipment to NEA directly before Completion Gateway (G3) and concluded before TOP could be granted.

Who to submit:

  • QP appointed should submit the above information and keep other relevant QPs in the loop.
  • The same QP should follow through the submissions for all gateways.

DisciplinesAgencyRequirement Category
URA

Land / Strata Subdivision and Amalgamation

  • Proposed Subdivision and/or Amalgamation plan(s) / model by Registered Surveyor

DisciplinesAgencyRequirement Category
SCDF

Air-Conditioning, Mechanical Ventilation and Fire Protection Plan (MV & FP)

  • Automatic Fire Alarm System
  • Automatic Fire Extinguishing System
  • Emergency Voice Communication System
  • Smoke Control System
  • Calculations and reports (where applicable)
  • Detailed layout and floor plan showing Fire Protection and Mechanical Ventilation system of development
  • Key features of the building in which the system is to be installed
  • Schematic diagram of the overall system showing clearly the key features and their functions, relative locations in the building, lots, sizes, capacities and other essential information incl. the air distribution design arrangement in the case of air-conditioning and mechanical ventilation systems
  • Layout of the system on every floor plan showing clearly the various parts and their functions, locations, arrangements, sizes, capacities and other essential information
  • Necessary cross-sectional views as superimposed on the building or part thereof to fully describe the details and configurations of the system
  • A colour scheme to clearly distinguish the various distinct parts of the system and the different systems from one another
  • Volumetric rate of flow of air at each point of inlet and outlet of each system including those serving protected staircases, exit passageways, lobbies, areas of refuge, the Fire Command Centre, fire pump rooms, generator rooms, rooms used for the storage of flammable liquids or gas or other areas of special risk;
  • Location of:
    • Fire compartment walls, floors, air shafts, fire dampers, smoke detectors and other fire precautionary features

Mechanical Ventilation System

QP to declare at those functional space which are provided with the following Ventilation System(s):

• Natural ventilation (NV)
• Mechanical ventilation (MV)*
• Pressurisation*
• Cross-ventilation
• Cross-ventilation with intermediate - ventilation opening

• Vapour extraction system (spray painting booth)

*: Details to be provided and submitted by M&E QP in Mechanical Ventilation (MV) Plan under Independent Submissions

DisciplinesAgencyRequirement Category
PUB
  • Earth Control Measures (ECM) Plan
  • Details of temporary works affecting drainage / within drainage reserve

DisciplinesAgencyRequirement Category
PUB
  • Details and scope of works on manholes and sewers
  • Specified activities within sewer corridor 

DisciplinesAgencyRequirement Category
BCA

Detailed CD Door and Services Penetration

The following shall be clearly illustrated in the submission:

  • EHD and PT door details - All CD door leaf and door frame details including frame anchorages and associated reinforcement, CD support structures and their line load reinforcement details, including any adjacent services penetrations.
  • Services penetrations - Size of openings and type of services penetrations such as MCTs, puddle flanges, etc., in walls or slabs next to or in the vicinity of the CD doors.

Mechanical Plans (CM)

  • Environmental Control System (ECS), Water Supply System, Sanitary System, Drainage System, Fire Protection System

The following shall be clearly illustrated in the submission for each of the systems above:

  • All CD related plantrooms and ancillary rooms, locations, setting-out and performance capacities of CD related equipment, services sizes, layout, and routings and their supports.
  • CD permanent toilets and CD dry toilets.
  • All CD related schematics, single line diagrams, and typical installation details.
  • Locations, clear dimensions, and performance capacities of CD related equipment, accessories, services, and their supports from ceilings, walls, and floors.
  • Size of openings and type of services penetrations such as MCTs, puddle flanges, etc., in walls or slabs next to or in the vicinity of the CD doors.
  • Provision of ventilation duct hinged-end doors (VDHD) at all ventilation supply and exhaust openings at the ventilation shafts/plenums.

Electrical Plan (CE)

  • Electrical Power System, CD Communications System, CD Door Monitoring System, CD Equipment Monitoring System

The following shall be clearly illustrated in the submission for each of the systems above:

  • CD Plans layout at ground level, station concourse, station platform and any other level or space associated with the CD shelter, such as mezzanine floors and subway connections.
  • All CD related plantrooms and ancillary rooms, setting-out and performance capacities of CD related equipment, accessories and services sizes, layout, and routings and their related supports.
  • All CD related single line diagrams, schematics, and typical installation details.
  • Locations, clear dimensions, and performance capacities of CD related equipment, accessories, services, and their supports from ceilings, walls, and floors.
  • Size of openings and type of services penetrations such as MCTs, puddle flanges, etc., in walls or slabs next to or in the vicinity of the CD doors.

Shock Design

Shock Design for Architectural & Structural (CKS), Mechanical (CKM), and Electrical (CKE) works shall be submitted with the following:

  1. Cover letter
  2. Shock design report
  3. Shock calculations for equipment
  4. Shock calculations for services
  5. Detailed drawings for shock support

DisciplinesAgencyRequirement Category
BCA

Structural Design (Other Works e.g. demolition, ERSS, cladding, safety barrier, temporary traffic decking)

  • 2D Drawings are acceptable for independent submissions.
  • Structural design of ancillary works and components such as demolition, temporary ERSS, barriers & cladding, temporary traffic decking.
  • Structural design of localized works for ancillary structures e.g. cladding, barrier.
  • These plans will need to make reference back to the coordinated model submitted by the Main QP at the Construction Gateway (G2).

Design Calculation Reports

  • From QP, AC, [QP(Geo) & AC (Geo), if needed]

Additional Supporting Documents:

  • Site investigation report in PDF & AGS format.
  • Impact assessment report.
  • Design consideration for Earth Retaining or Stabilising Structures (ERSS)) – ERSS_Annex A.
  • QP’s & AC’s Certification for fixings of ancillary structures.

DisciplinesAgencyRequirement Category
PUB
  • Site plans, water reticulation schematic / layout drawing of WSI design works and water requirements
  • Specified activities within water pipe corridor