Circulars

Filter

Advisories
Enterprise SG

ENTERPRISE SINGAPORE CALLS FOR PUBLIC COMMENTS 7 MARCH 2025

ENTERPRISE SINGAPORE CALLS FOR PUBLIC COMMENTS 7 MARCH 2025

Published Date: 11 March 2025
Effective Date: 10 March 2025

Advisories
LTA, URA

CORENET X SUBMISSION AND APPROVAL PROCESS FOR TRANSPORT IMPACT ASSESSMENTS (TIA)

Corenet X Submission and Approval Process for Transport Impact Assessments (TIA)

Published Date: 07 March 2025
Effective Date: 07 March 2025

Publication
URA

RELAXATION OF LODGMENT CRITERIA FOR LANDED HOUSES AND CLARIFICATION ON LANDED HOUSE GUIDELINES

Relaxation of lodgment criteria for landed houses and clarification on landed house guidelines

Published Date: 04 March 2025
Effective Date: 03 March 2025

Requirements
URA

DESIGN GUIDE FOR PICK-UP AND DROP-OFF POINTS (PUDOS) AT DEVELOPMENT

Design Guide for Pick-up and Drop-off Points (PUDOs) at Development

Published Date: 04 March 2025
Effective Date: 03 March 2025

Administration / Service Improvements
NEA

PRACTICAL GUIDE FOR POST-INSTALLED REINFORCEMENT

Practical Guide For Post-Installed Reinforcement

Published Date: 03 March 2025
Effective Date: 03 March 2025

Publication
SCDF

SINGAPORE CIVIL DEFENCE FORCE (SCDF) SERVICE TRANSFORMATION UPDATE

As part of our service transformation, we would like to inform you that SCDF has made the following changes to our services: a) SCDF General Enquiry and Fire Hazard Reporting hotlines have been merged. The public can reach SCDF hotline at 1800 280 0000. b) All non-emergency contact numbers on the SCDF website have been replaced with the online https://www.scdf.gov.sg/home/feedback . 2. feedback form at Please circulate this notification to all relevant members within your Institution/Association/Board/Workgroup. It is important that all stakeholders are aware of this change to ensure smooth communication with SCDF for non-emergency matters.

Published Date: 03 March 2025
Effective Date: 03 March 2025

Administration / Service Improvements
BCA

UPDATES TO THE APPROVED DOCUMENT (1 MARCH 2026)

The update to the Approved Document comprises mostly editorial changes, which are meant to improve clarity. Other than that, the rest of the updates comprises removal of references to the old BS/SS standards, rule relaxation and streamlining. The updates shall apply to all projects for which the first set of plans is submitted to the Commissioner ofBuilding Control for approval on or after 1 September 2025.

Published Date: 03 March 2025
Effective Date: 03 March 2025

Administration / Service Improvements
BCA

UPDATES TO THE APPROVED DOCUMENT (1 MARCH 2023)

The update to the Approved Document comprises mostly editorial changes, which are meant to improve clarity. Other than that, the rest of the updates comprises removal of references to the old BS/SS standards, rule relaxation and streamlining. The updates shall apply to all projects for which the first set of plans is submitted to the Commissioner ofBuilding Control for approval on or after 1 September 2025.

Published Date: 03 March 2025
Effective Date: 03 March 2025

Publication
SCDF, URA

AMENDMENTS TO FIRE CODE 2023 3RD BATCH OF AMENDMENTS

SCDF would like to issue the 3rd batch of amendments to the Code of Practice for Fire Precautions in Buildings 2023 (Fire Code 2023). The amendments, which were deliberated and accepted by the Fire Code Review Committee are attached as Annex A of this circular. 2. Amendments stipulated in Annex A shall take effect from the date specified therein. Qualified Persons who wish to comply with the requirements in this Circular for any proposed plans of fire safety works for new buildings or existing buildings to be submitted during the 6month grace period (i.e., 3 Mar 2025 to 3 Sep 2025) can do so and are not required to apply for waivers. Such plans that are submitted to SCDF for approval on or after the effective date shall be subject to the amendments made to the Fire Code.

Published Date: 03 March 2025
Effective Date: 03 March 2025

Administration / Service Improvements
BCA

UPDATES TO THE APPROVED DOCUMENT (1 MARCH 2025)

The update to the Approved Document comprises mostly editorial changes, which are meant to improve clarity. Other than that, the rest of the updates comprises removal of references to the old BS/SS standards, rule relaxation and streamlining. The updates shall apply to all projects for which the first set of plans is submitted to the Commissioner ofBuilding Control for approval on or after 1 September 2025.

Published Date: 03 March 2025
Effective Date: 03 March 2025

Subscribers are also advised to check the respective agencies’ websites directly for non-regulatory circulars and announcements.