Circulars

Filter

Requirements
PUB

CODE OF PRACTICE ON SEWERAGE AND SANITARY WORKS (THIRD EDITION MAR 2025)

Code Of Practice On Sewerage And Sanitary Works (Third Edition Mar 2025)

Published Date: 03 March 2025
Effective Date: 03 March 2025

Requirements
BCA

UPDATES TO THE APPROVED DOCUMENT (1 MARCH 2025)

The update to the Approved Document comprises mostly editorial changes, which are meant to improve clarity. Other than that, the rest of the updates comprises removal of references to the old BS/SS standards, rule relaxation and streamlining. The updates shall apply to all projects for which the first set of plans is submitted to the Commissioner ofBuilding Control for approval on or after 1 September 2025.

Published Date: 03 March 2025
Effective Date: 03 March 2025

Requirements
SCDF

AMENDMENTS TO FIRE CODE 2023 3RD BATCH OF AMENDMENTS

SCDF would like to issue the 3rd batch of amendments to the Code of Practice for Fire Precautions in Buildings 2023 (Fire Code 2023). The amendments, which were deliberated and accepted by the Fire Code Review Committee are attached as Annex A of this circular. 2. Amendments stipulated in Annex A shall take effect from the date specified therein. Qualified Persons who wish to comply with the requirements in this Circular for any proposed plans of fire safety works for new buildings or existing buildings to be submitted during the 6month grace period (i.e., 3 Mar 2025 to 3 Sep 2025) can do so and are not required to apply for waivers. Such plans that are submitted to SCDF for approval on or after the effective date shall be subject to the amendments made to the Fire Code.

Published Date: 03 March 2025
Effective Date: 03 March 2025

Grant Calls / Call for Submissions
BCA

LAUNCH OF RIE2025 COT GRANT CALL 6

Launch of Cities of Tomorrow RIE2025 Grant Call 6

Published Date: 26 February 2025
Effective Date: 27 February 2025

Reminder
BCA

MOM-BCA ADVISORY ON HIRING OF PHANTOM WORKERS

MOM-BCA Joint Advisory on Hiring of Phantom Workers

Published Date: 14 February 2025
Effective Date: 14 February 2025

Promotional
URA

REVISIONS TO REJUVENATION INCENTIVE SCHEMES FOR STRATEGIC AREAS

Revisions to Rejuvenation Incentive Schemes for Strategic Areas

Published Date: 07 February 2025
Effective Date: 07 February 2025

Advisories
URA

CLARIFICATION ON CONVERSION OF SURPLUS CAR PARKING SPACES (URA)

Clarification on Conversion of Surplus Car Parking Spaces

Published Date: 07 February 2025
Effective Date: 07 February 2025

Requirements
LTA

USE OF ENHANCED FLEXIBLE PAVEMENT OVER WATER PIPE AT TRAFFIC JUNCTIONS, BUS LANES AND BUS BAYS

Use of Enhanced Flexible Pavement Over Water Pipe at Traffic Junctions, Bus Lanes and Bus Bays

Published Date: 24 January 2025
Effective Date: 24 January 2025

Requirements
BCA

BCA-URA - JOINT CIRCULAR ON UPDATES TO CORENET X IMPLEMENTATION PLAN

In our circular dated 26 September 2023, industry was informed of the implementation plan for CORENET X. The intention remains unchanged, that all projects should transit to the new regulatory approval process in phases. Over the past year, agencies have been in close dialogue with industry partners and practitioners. The feedback from industry has been useful in refining our processes and re-calibrating our implementation strategies, to facilitate a smoother transition.The adjustments to the implementation plan are outlined in this circular, including key steps that industry should take to prepare for CORENET X implementation

Keywords: Ura, Corenet X

Published Date: 23 January 2025
Effective Date: 23 January 2025

Reminder
BCA

SAFE DESIGN AND INSTALLATION OF OUTRIGGERS OR OVERHEAD SUPPORTS FOR SUSPENDED SCAFFOLDS

Circular on Safe Design and Installation of Outriggers or Overhead Supports for Suspended Scaffolds

Published Date: 10 January 2025
Effective Date: 10 January 2025

Subscribers are also advised to check the respective agencies’ websites directly for non-regulatory circulars and announcements.