Filter
Promotional
BCA
USE OF TEMPERATURE-MATCHED CURING OF CONCRETE SPECIMENS
USE OF TEMPERATURE-MATCHED CURING OF CONCRETE SPECIMENS
Keywords: Temperature-matched Curing, Lta, Bs 1881-130, Aces, Tmc, Strength of Concrete
Published Date:
02 December 2024
Effective Date:
02 December 2024
Technical Guides
BCA
FINDINGS OF ENHANCED PSI GUIDELINES
Published Date:
02 December 2024
Effective Date:
02 December 2024
Requirements
BCA
This circular is to inform the industry of the requirements governing Serviced Apartments II (SA2) under the respective regulatory agencies.
Keywords: Iacc, Service Apartments Ii, Sa2
Published Date:
02 December 2024
Effective Date:
02 December 2024
Requirements
PUB
IMPLEMENTATION OF NEW APPLICATION FEE FOR WATER MAIN DIVERSION
Keywords: Application Fee, Water Main Diversion
Published Date:
02 December 2024
Effective Date:
02 December 2024
Technical Guides
LTA
REVISION TO THE CODE OF PRACTICE FOR RAILWAY PROTECTION (DECEMBER 2024 EDITION)
Revision to the Code of Practice for Railway Protection (December 2024 Edition)
Published Date:
02 December 2024
Effective Date:
02 December 2024
Requirements
BCA
This circular is to remind the industry on the required site conditions and requirements for TOP/CSC inspection.Background
Keywords: Top/csc Inspection, Quality Mark, Required Site Conditions, Conquas
Published Date:
02 December 2024
Effective Date:
02 December 2024
Requirements
BCA
REQUIREMENTS TO MITIGATE RISK ASSOCIATED WITH UTILITY GAP WITHIN ERSS
Requirements To Mitigate Risk Associated With Utility Gap Within ERSS
Keywords: Sewer Pipes, Geoss, Excavation, Earth Retaining Or Stabilizing Structure, Aces, Power, Water Pipes, Underground Utilities, Utility Gap, Ies, Erss, Cables
Published Date:
02 December 2024
Effective Date:
02 December 2024
Requirements
BCA
This circular is to share with the industry on acceptable solutions for external works requirements within congested sites.
Keywords: External Works, Iacc, Congested Sites
Published Date:
02 December 2024
Effective Date:
02 December 2024
Requirements
BCA
ADVISORY ON THE DUTIES AND RESPONSIBILITIES OF DEVELOPERS
Advisory On The Duties And Responsibilities Of Developers
Published Date:
02 December 2024
Effective Date:
02 December 2024
Requirements
URA
REVISED SITE COVERAGE GUIDELINES
Keywords: Bungalows, Landed Housing Development, Sun-shading Feature, Gcbs, Site Coverage
Published Date:
01 December 2024
Effective Date:
01 December 2024
Subscribers are also advised to check the respective agencies’ websites directly for non-regulatory circulars and announcements.