Filter
Requirements
BCA
Guidelines for Standard Performance Tests on Composite Wall System of Concrete Prefabricated Prefinished Volumetric Construction (PPVC) Project
Keywords: Ipa, Composite Wall System of Concrete Prefabricated Prefinished Volumetric Construction, In-principle Acceptance, Ppvc, Aces, Ies, Pbu
Published Date:
20 December 2024
Effective Date:
20 December 2024
Requirements
BCA
REQUIREMENTS TO MITIGATE RISK ASSOCIATED WITH UTILITY GAP WITHIN ERSS
Requirements To Mitigate Risk Associated With Utility Gap Within ERSS
Keywords: Sewer Pipes, Geoss, Excavation, Earth Retaining Or Stabilizing Structure, Aces, Power, Water Pipes, Underground Utilities, Utility Gap, Ies, Erss, Cables
Published Date:
02 December 2024
Effective Date:
02 December 2024
Requirements
BCA
REQUIREMENTS AND GUIDELINES FOR DESIGN AND CONSTRUCTION OF RAFT AND PILED-RAFT FOUNDATION
Requirements And Guidelines For Design And Construction Of Raft And Piled-Raft Foundation
Keywords: Ec7, Geoss, Aces, Piled-raft Foundation, Guidelines, Ies, Raft
Published Date:
31 August 2024
Effective Date:
01 September 2024
Requirements
BCA
Pre-Consultation Required for the Use of Reinforced Autoclaved Aerated Concrete (RAAC) as Structural Elements in Building Works
Keywords: Pre-consultation, Raac, Aces, Ies, Reinforced Autoclaved Aerated Concrete
Published Date:
31 August 2024
Effective Date:
02 September 2024
Subscribers are also advised to check the respective agencies’ websites directly for non-regulatory circulars and announcements.