Circulars

Filter

Requirements
SCDF

AMENDMENTS TO FIRE CODE 2023 2ND BATCH OF AMENDMENTS

SCDF would like to issue the 2nd batch of amendments to the Code of Practice for Fire Precautions in Buildings 2023 (Fire Code 2023). The amendments which were deliberated and accepted by the Fire Code Review Committee are attached as Annexes A & B of this circular. 2. Amendments stipulated in Annexes A & B shall take effect from the date specified therein. Qualified Persons who wish to comply with the requirements in this Circular for any proposed plans of fire safety works for new buildings or existing buildings to be submitted during the 6-month grace period (i.e. 2 Sep 2024 to 1 Mar 2025) can do so and are not required to apply for waivers. Such plans that are submitted to SCDF for approval on or after the effective date shall be subjected to the amendments made to the Fire Code.

Published Date: 02 September 2024
Effective Date: 02 September 2024

Administration / Service Improvements
URA

PROCESSING FEE STRUCTURE FOR DEVELOPMENT APPLICATIONS SUBMITTED VIA CORENET X

PROCESSING FEE STRUCTURE FOR DEVELOPMENT APPLICATIONS SUBMITTED VIA CORENET X

Published Date: 02 September 2024
Effective Date: 02 September 2024

Requirements
BCA

REMINDER FOR DESIGN QUALIFIED PERSONS, SUPERVISING QUALIFIED PERSONS, DEVELOPERS AND BUILDERS TO CARRY OUT THEIR DUTIES TO ACHIEVE SAFE TUNNELLING WORKS

Reminder For Design Qualified Persons, Supervising Qualified Persons, Developers And Builders To Carry Out Their Duties To Achieve Safe Tunnelling Works

Published Date: 31 August 2024
Effective Date: 01 September 2024

Requirements
BCA

GUIDELINES FOR CUTTER HEAD INTERVENTIONS (CHI)

Guidelines for Cutter Head Interventions (CHI)

Published Date: 31 August 2024
Effective Date: 01 September 2024

Requirements
BCA

REQUIREMENTS AND GUIDELINES FOR DESIGN AND CONSTRUCTION OF RAFT AND PILED-RAFT FOUNDATION

Requirements And Guidelines For Design And Construction Of Raft And Piled-Raft Foundation

Published Date: 31 August 2024
Effective Date: 01 September 2024

Requirements
BCA

PRE-CONSULTATION REQUIRED FOR THE USE OF REINFORCED AUTOCLAVED AERATED CONCRETE (RAAC) AS STRUCTURAL ELEMENTS IN BUILDING WORKS

Pre-Consultation Required for the Use of Reinforced Autoclaved Aerated Concrete (RAAC) as Structural Elements in Building Works

Published Date: 31 August 2024
Effective Date: 02 September 2024

Technical Guides
BCA

DESIGN GUIDE FOR USE OF HEADED BARS TO EUROCODE 2

Design Guide for Use of Headed Bars to Eurocode 2

Published Date: 30 August 2024
Effective Date: 02 September 2024

Administration / Service Improvements
LTA

INTRODUCTION OF CONSULTATION REQUEST FORM FOR ORGANISED EMAIL CONSULTATIONS

Introduction of Consultation Request Form for Organised Email Consultations

Published Date: 12 August 2024
Effective Date: 12 August 2024

Standards
Enterprise SG

ENTERPRISE SINGAPORE CALLS FOR PUBLIC COMMENTS 2 AUGUST 2024

ENTERPRISE SINGAPORE CALLS FOR PUBLIC COMMENTS 2 AUGUST 2024

Published Date: 05 August 2024
Effective Date: 06 August 2024

Grant Calls / Call for Submissions
BCA

Subscribers are also advised to check the respective agencies’ websites directly for non-regulatory circulars and announcements.