Filter
Grant
BCA
Reminder For Design Qualified Persons, Supervising Qualified Persons, Developers And Builders To Carry Out Their Duties To Achieve Safe Tunnelling Works
Published Date:
31 August 2024
Effective Date:
01 September 2024
Publication
BCA
REQUIREMENTS AND GUIDELINES FOR DESIGN AND CONSTRUCTION OF RAFT AND PILED-RAFT FOUNDATION
Requirements And Guidelines For Design And Construction Of Raft And Piled-Raft Foundation
Published Date:
31 August 2024
Effective Date:
01 September 2024
Grant Calls / Call for Submissions
BCA
Pre-Consultation Required for the Use of Reinforced Autoclaved Aerated Concrete (RAAC) as Structural Elements in Building Works
Published Date:
31 August 2024
Effective Date:
02 September 2024
Standards
BCA
DESIGN GUIDE FOR USE OF HEADED BARS TO EUROCODE 2
Design Guide for Use of Headed Bars to Eurocode 2
Published Date:
30 August 2024
Effective Date:
02 September 2024
Pre-Consultation / Call for Comments
BCA
LAUNCH OF GBIC 2.0 RESEARCH AND INNOVATION CHALLENGE CALL FOR DECARBONISATION
Published Date:
15 July 2024
Effective Date:
16 July 2024
Advisories
BCA
CONSOLIDATED QUESTIONS & ANSWERS FROM THE BCA ANNUAL SHARING ON BP/TOP REGULATORY UPDATES 2024
We refer to the BCA Annual Sharing Session held virtually on 07 May 2024. The seminar session provided a useful platform where BCA engaged Qualified Persons, Builders and Developers, to enable better understanding and clarity on regulatory requirements. Following the Sharing Session, BCA has consolidated the queries and correspondingresponses, which are appended herewith.
Published Date:
21 June 2024
Effective Date:
21 June 2024
Grant Calls / Call for Submissions
BCA
Keywords: Coretrade
Published Date:
21 June 2024
Effective Date:
21 June 2024
Standards
BCA
Circular on Safety Considerations in Installation and Maintenance of Aircon Condensing Units and their Structural Supporting System
Published Date:
03 June 2024
Effective Date:
03 June 2024
Grant
BCA
CODE OF PRACTICE FOR VERTICAL PLATFORM LIFT WITH ENCLOSED PLATFORM AND AUTOMATIC SLIDING DOORS
This circular informs the industry of the following:(a) Publication of a new Code of Practice (COP) for vertical platform lifts with enclosed platform and automatic sliding doors; and(b) Adoption of the COP as an acceptable solution for these lifts for the purpose of complying with the performance requirements for lifts under Fifth Schedule of the Building Control Regulations 2003.
Published Date:
03 June 2024
Effective Date:
03 June 2024
Administration / Service Improvements
BCA
CIRCULAR ON BUILDING CONTROL (AMENDMENT) ACT_REGULATIONS 2024_REMINDER-R2
Circular on Building Control (Amendment) Act_Regulations 2024_reminder-r2
Published Date:
29 May 2024
Effective Date:
29 May 2024
Subscribers are also advised to check the respective agencies’ websites directly for non-regulatory circulars and announcements.